0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Developing six hybrid machine learning models based on gaussian process regression and meta-heuristic optimization algorithms for prediction of duration and cost of road tunnels construction

This publication has been cited in the following 2 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10696610
  • Published on:
    11/12/2022
  • Last updated on:
    11/12/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine