0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Developing a Cost-Payment Coordination Model for Project Cost Flow Forecasting/ Sąnaudų ir mokėjimo koordinavimo modelio, skirto projektų sąnaudų srautų prognozėms, kūrimas

This publication has been cited in the following 3 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10363014
  • Published on:
    12/08/2019
  • Last updated on:
    12/08/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine