Determining the Probability of Project Cost Overruns
Author(s): |
Peter E. D. Love
Xiangyu Wang Chun-Pong Sing Robert L. K. Tiong |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, March 2013, n. 3, v. 139 |
Page(s): | 321-330 |
DOI: | 10.1061/(asce)co.1943-7862.0000575 |
- About this
data sheet - Reference-ID
10169598 - Published on:
01/12/2018 - Last updated on:
01/12/2018