0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Determining the Factors Influencing Construction Project Management Performance Improvement through Earned Value-Based Value Engineering Strategy: A Delphi-Based Survey

This publication has been cited in the following 4 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10737525
  • Published on:
    02/09/2023
  • Last updated on:
    14/09/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine