Determining the Causes of Punching Shear in Reinforced Slabs Using Fishbone Diagram
Author(s): |
Abbas Mohammed Burhan
Meervat R. Altaie Omer K. Al-Kubaisi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Civil Engineering Journal, November 2018, n. 11, v. 4 |
Page(s): | 2642 |
DOI: | 10.28991/cej-03091188 |
Abstract: |
Risk identification and assessment can be analysed using many risk management tools. Fishbone diagram is one of these techniques which can be employed, for the identification of the causes behind the construction failure, which has become a phenomenon that often gets repeated in several projects. If these failures are not understood and handled scientifically, it may lead to disputes between the project parties. Additionally, the construction failure also leads to an increase in the project budget, which in turn causes a delay in the completion of the projects. Punching shear in reinforcement slab may be one of the reasons for construction failures. However, there are many doubts about other causes that lead to this failure as well as the role of these causes in the construction failure. Also, there are many causes linked to this failure of which some fall on the designer and the others fall on the contractor. Thus, this research aims to determine the causes of punching shear failure in the concrete slab and its role in the failure using a logic managerial analysis. For this purpose, the applicability of the Fishbone diagram has been extended, for the analysis of probability as well as the impact of the risk of punching shear, thus elucidating the risk score of each category without ignoring the global risk. In this direction, interviews and questionnaires are conducted with numerous experts specialize in both the design and execution field of construction projects for identifying the most important causes that lead to the occurrence of punching shear failure. Further, the Fishbone diagram for punching shear’s risk illuminated that impact of some of the primary and secondary causes such as planning, designing, and maintenance is more than the expectation. Therefore, the concentration in these areas should be carried out by taking into consideration the adapt risk response plan to prevent or mitigate these risks. |
Copyright: | © 2018 Abbas Mohammed Burhan, Meervat R. Altaie, Omer K. Al-Kubaisi |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
0.76 MB
- About this
data sheet - Reference-ID
10340878 - Published on:
14/08/2019 - Last updated on:
02/06/2021