Determining initial tension of carrying cable in nonlinear analysis of bi-cable ropeway – Case study
Author(s): |
Marta Knawa-Hawryszków
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering Structures, October 2021, v. 244 |
Page(s): | 112769 |
DOI: | 10.1016/j.engstruct.2021.112769 |
- About this
data sheet - Reference-ID
10623998 - Published on:
26/08/2021 - Last updated on:
26/08/2021