0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example

This publication has been cited in the following 4 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10576790
  • Published on:
    26/02/2021
  • Last updated on:
    26/02/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine