0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Determination of the Market Value of Works in Progress with Probability Graphs

Author(s):
Medium: journal article
Language(s): English
Published in: Organization, Technology and Management in Construction, , n. 2, v. 7
Page(s): 1271-1279
DOI: 10.5592/otmcj.2015.2.1
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5592/otmcj.2015.2.1.
  • About this
    data sheet
  • Reference-ID
    10411623
  • Published on:
    12/02/2020
  • Last updated on:
    12/04/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine