0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Determination of the Installation Time of Secondary Liner during Excavation of Large Cross-Section Double-Arch Tunnels

This publication lists 17 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10535998
  • Published on:
    01/01/2021
  • Last updated on:
    02/06/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine