0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Determination of Minimum Intermediary Hold Durations in Multistage First-Filling Schedule of Earth-Fill Dam Reservoirs

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/ijgnai.gmeng-9733.
  • About this
    data sheet
  • Reference-ID
    10789675
  • Published on:
    20/06/2024
  • Last updated on:
    20/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine