0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Determination of Effective Delay-Avoidance Practices in Construction Projects

Author(s): ORCID (Postdoctoral Researcher, Dept. of Civil Engineering and Geomatics, Cyprus Univ. of Technology, 30 Arch. Kyprianou St., Limassol 3036, Cyprus; ERATOSTHENES Centre of Excellence, Limassol 3603, Cyprus (corresponding author))
(Associate Professor, Dept. of Civil Engineering and Geomatics, Cyprus Univ. of Technology, 30 Arch. Kyprianou St., Limassol 3036, Cyprus; ERATOSTHENES Centre of Excellence, Limassol 3603, Cyprus.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 1, v. 13
Page(s): 04520039
DOI: 10.1061/(asce)la.1943-4170.0000438
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000438.
  • About this
    data sheet
  • Reference-ID
    10580076
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine