0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Design/Builder Cannot Alter Its Proposal after Award if Alteration Does Not Satisfy Contract Requirements

This publication lists 1 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10332027
  • Published on:
    29/07/2019
  • Last updated on:
    31/07/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine