Designating Responsible Parties for Drainage within 1.5 m of a Building
Author(s): |
Lance VanDemark
(Ph.D. Student, Construction Engineering and Management, Dept. of Civil Engineering, Univ. of Colorado Denver, 1200 Larimer, Denver, CO 80204 (corresponding author))
Caroline M. Clevenger (Associate Professor, Construction Engineering and Management, Dept. of Civil Engineering, Univ. of Colorado Denver, 1200 Larimer, Denver, CO 80204) Elizabeth Brogan (Ph.D. Student, Construction Engineering and Management, Dept. of Civil Engineering, Univ. of Colorado Denver, 1200 Larimer, Denver, CO 80204.) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, August 2019, n. 3, v. 11 |
Page(s): | 03719001 |
DOI: | 10.1061/(asce)la.1943-4170.0000298 |
- About this
data sheet - Reference-ID
10579920 - Published on:
08/03/2021 - Last updated on:
08/03/2021