Design of a Plastic Concrete Cutoff Wall as a Remediation Plan for an Earth-Fill Dam Subjected to an Internal Erosion
Author(s): |
Seyyed-Kazem Razavi
(Ph.D. Student, Dept. of Geotechnical Engineering, Faculty of Civil Engineering, Univ. of Tabriz, Tabriz 41666–14171, Iran)
Masoud Hajialilue-Bonab (Professor, Dept. of Geotechnical Engineering, Faculty of Civil Engineering, Univ. of Tabriz, Tabriz 41666–14171, Iran (corresponding author)) Ali Pak (Professor, Civil Engineering Dept., Sharif Univ. of Technology, Tehran 11155–9313, Iran) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | International Journal of Geomechanics, May 2021, n. 5, v. 21 |
Page(s): | 04021061 |
DOI: | 10.1061/(asce)gm.1943-5622.0001991 |
- About this
data sheet - Reference-ID
10606699 - Published on:
08/05/2021 - Last updated on:
08/05/2021