Design and construction of the Geum Ho riverbed tunnel in the 2nd Dae Gu subway construction project: A case history
Author(s): |
C. J. Lee
S. H. Yoon J. Y. Lee J. S. Kim |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, May 2006, n. 3-4, v. 21 |
Page(s): | 459 |
DOI: | 10.1016/j.tust.2005.12.097 |
- About this
data sheet - Reference-ID
10132861 - Published on:
07/12/2018 - Last updated on:
07/12/2018