Design and Construction of the First Renewal Project in Tomei Expressway─Bridge Slab Replacement of Mochimune Viaduct (Down Line)─
Author(s): |
O. Sanada
T. Sato H. Yoshimatsu M. Kitagawa |
---|---|
Medium: | journal article |
Language(s): | Japanese |
Published in: | Concrete Journal (JCI), 2017, n. 10, v. 55 |
Page(s): | 887-893 |
DOI: | 10.3151/coj.55.10_887 |
- About this
data sheet - Reference-ID
10437555 - Published on:
08/10/2020 - Last updated on:
08/10/2020