0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Delay Claims in U.K. Contracts

This publication lists 6 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10156030
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine