0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Delay Claims in Road Construction: Best Practices for a Standard Delay Claims Management System

Author(s): (Assistant Professor, Dept. of Technology and Construction Management, Missouri State Univ., Springfield, MO 65897 (corresponding author). E-mial:)
(Professor, Dept. of Civil Engineering, Colorado State Univ., Fort Collins, CO 80523.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 8
Page(s): 02516001
DOI: 10.1061/(asce)la.1943-4170.0000186
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000186.
  • About this
    data sheet
  • Reference-ID
    10579809
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine