0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Delay Analysis Methodologies Used by Engineering and Construction Firms in Egypt

Author(s): (Contracts and Procurement Manager, Sixth of October Development and Investment Company, Km. 38 Cairo-Alexandria Desert Rd., Sheikh Zayed City, P.O. Box 119, Sheikh Zayed, Cairo 12593, Egypt; formerly, M.Sc. Student, Dept. of Structural Engineering, Facult)
(Senior Lecturer, School of Property, Construction and Project Management, RMIT Univ., G.P.O. Box 2476, Melbourne, VIC 3001, Australia; Associate Professor, Dept. of Structural Engineering, Faculty of Engineering, Cairo Univ., Giza 12613, Egypt (correspond)
(Professor, Dept. of Structural Engineering, Faculty of Engineering, Cairo Univ., Giza 12613, Egypt.)
(Professor, Dept. of Structural Engineering, Faculty of Engineering, Cairo Univ., Giza 12613, Egypt.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 11
Page(s): 04519006
DOI: 10.1061/(asce)la.1943-4170.0000293
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000293.
  • About this
    data sheet
  • Reference-ID
    10579941
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine