Deformation control benchmarks and secondary lining construction timing in squeezing phyllite tunnels: A case study of Chengdu-Lanzhou Railway
Author(s): |
Xiaolong Guo
Xiangsen Fan Zhongsheng Tan |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, January 2024, v. 143 |
Page(s): | 105454 |
DOI: | 10.1016/j.tust.2023.105454 |
- About this
data sheet - Reference-ID
10743222 - Published on:
28/10/2023 - Last updated on:
28/10/2023