0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Deep Multilayer Perceptron Neural Network for the Prediction of Iranian Dam Project Delay Risks

This publication lists 65 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10708259
  • Published on:
    21/03/2023
  • Last updated on:
    21/03/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine