Decommissioning of the A14 Huntingdon Railway Viaduct, Cambridgeshire
Author(s): |
Colin George
Mark Hatcher Chris Law Ionut Paunescu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | The Structural Engineer, January 2022, n. 1, v. 100 |
Page(s): | 28-34 |
DOI: | 10.56330/fjlt5552 |
Abstract: |
This paper discusses the demolition of the central suspended span of the Huntingdon Railway Viaduct, which crosses the East Coast Main Line on the west side of the Cambridgeshire town. The structure became redundant in December 2019 when a new offline section of the A14 was opened to the south of the town as part of a National Highways improvement scheme. |
- About this
data sheet - Reference-ID
10762690 - Published on:
23/03/2024 - Last updated on:
23/03/2024