0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Decision Support Framework for the Choice of Delay Analysis Techniques Used in Extension of Time Claims

This publication lists 24 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10797969
  • Published on:
    01/09/2024
  • Last updated on:
    01/09/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine