0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A decision support framework for extension of time claims for the JBCC Principal Building Agreement

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10411803
  • Published on:
    12/02/2020
  • Last updated on:
    12/02/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine