0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Dealing with construction cost overruns using data mining

Author(s):

Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 7-8, v. 32
Page(s): 682-694
DOI: 10.1080/01446193.2014.933854
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2014.933854.
  • About this
    data sheet
  • Reference-ID
    10611580
  • Published on:
    18/06/2021
  • Last updated on:
    18/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine