0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

De Hassi Messaoud à la Méditerranée. Le pipeline Haoud et Hamra-Bougie

9- Les procédés de préassemblage des tubes dans la construction des canalisations soudées

Author(s):
Medium: journal article
Language(s): French
Published in: Travaux, , n. 306
Page(s): 209
Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10018791
  • Published on:
    01/06/2005
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine