Data Preprocessing for Artificial Neural Network Applications in Prioritizing Railroad Projects – A Practical Experience in Taiwan

Author(s):



Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 4, v. 18
Page(s): 483-494
DOI: 10.3846/13923730.2012.699914
Abstract:

Financial constraints necessitate the tradeoff among proposed railroad projects, so that the project priorities for implementation and budget allocation need to be determined by the ranking mechanisms in the government. At present, the Taiwan central government prioritizes funding allocations primarily using the analytic hierarchy process (AHP), a methodology that permits the synthesizing of subjective judgments systematically and logically into objective consensus. However, due to the coopetition and heterogeneity of railway projects, the proper priorities of railroad projects could not be always evaluated by the AHP. The decision makers prefer subjective judgments to referring to the AHP evaluation results. This circumstance not only decreased the AHP advantages, but also raised the risk of the policies. A method to consider both objective measures and subjective judgments of project attributes can help reduce this problem. Accordingly, combining the AHP with the artificial neural network (ANN) methodologies would theoretically be a proper solution to bring a ranking predication model by creating the obscure relations between objective measures by the AHP and subjective judgments. However, the inconsistency between the AHP evaluation and subjective judgments resulted in the inferior soundness of the AHP/ANN ranking forecast model. To overcome this problem, this study proposes the data preprocessing method (DPM) to calculate the correlation coefficient value using the subjective and objective ranking incidence matrixes; according to the correlation coefficient value, the consistency between the AHP rankings and subjective judgments of railroad projects can be evaluated and improved, so that the forecast accuracy of the AHP/ANN ranking forecast model can also be enhanced. Based on this concept, a practical railroad project ranking experience derived from the Institute of Transportation of Taiwan is illustrated in this paper to reveal the feasibility of applying the DPM to the AHP/ANN ranking prediction model.

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/13923730.2012.699914.
  • About this
    data sheet
  • Reference-ID
    10362963
  • Published on:
    12/08/2019
  • Last updated on:
    12/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine