0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A data-driven support system for the efficient schedule delay management of the ultra-high-voltage projects considering subjective risk preferences

This publication lists 40 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10714700
  • Published on:
    21/03/2023
  • Last updated on:
    21/03/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine