Cut-off wall construction using Cutter Soil Mixing: a case study

Author(s):


Medium: journal article
Language(s): English
Published in: geotechnik, , n. 1, v. 34
Page(s): 11-21
DOI: 10.1002/gete.201000021
Abstract:

Cutter Soil Mixing (CSM), a deep soil mixing method, was used to rehabilitate the Herbert Hoover Dike, Florida by installing a cutoff wall. After an introduction to the method including remarks on its advantages and limitations, the rehabilitation project and its background are presented. The paper describes the necessary approach to apply Cutter Soil Mixing under the specific site conditions. Finally, results obtained from an extensive testing program are discussed.

Keywords:
case history case study dike rehabilitation cut-off wall cutter soil mixing (CSM) sealing wall
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/gete.201000021.
  • About this
    data sheet
  • Reference-ID
    10064805
  • Published on:
    05/04/2011
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine