Author(s): |
Wim 't Hart
Han Vos Jaco H. Reusink Dimitri Tuinstra |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Civil Engineering Magazine, February 2004, n. 2, v. 74 |
Abstract: |
The design/build team charged with creating an aesthetically pleasing high-speed rail bridge in the Netherlands faced tough aesthetic and technical requirements, including tight construction tolerances, the need to withstand a ship collision, and stringent vibration control criteria. |