0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

CROSS Safety Report. Tower crane base designs

Medium: journal article
Language(s): English
Published in: The Structural Engineer, , n. 8, v. 100
Page(s): 16-17
DOI: 10.56330/ynfb3844
Abstract:

This month’s CROSS report again highlights the importance of a competent person fulfilling the role of Temporary Works Coordinator on a project and the need for suitable checking of designs.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.56330/ynfb3844.
  • About this
    data sheet
  • Reference-ID
    10762650
  • Published on:
    23/03/2024
  • Last updated on:
    23/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine