Critiquing contractors' scheduling by integrating rule-based and case-based reasoning
Author(s): |
Ren-Jye Dzeng
Hsin-Yun Lee |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, September 2004, n. 5, v. 13 |
Page(s): | 665-678 |
DOI: | 10.1016/j.autcon.2004.03.004 |
- About this
data sheet - Reference-ID
10189560 - Published on:
10/12/2018 - Last updated on:
10/12/2018