0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Critical pathways to enhanced innovation diffusion and business performance in Australian design firms

This publication lists 26 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10188677
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine