0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Critical Path Definition Using Multicriteria Decision Making: PROMETHEE Method

Author(s):
Medium: journal article
Language(s): English
Published in: Journal of Management in Engineering (ASCE), , n. 2, v. 29
Page(s): 158-163
DOI: 10.1061/(asce)me.1943-5479.0000135
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)me.1943-5479.0000135.
  • About this
    data sheet
  • Reference-ID
    10372027
  • Published on:
    29/08/2019
  • Last updated on:
    29/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine