0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Critical issues in the planning and execution phase of a pump storage or other hydro power plants - possibilities and limits of contractual solutions

Author(s): (Geisseler Law (Law Firm), Im Rebstall 1, 79112 Freiburg - GERMANY -)
Medium: journal article
Language(s): English
Published in: La Houille Blanche, , n. 2, v. 103
Page(s): 20-26
DOI: 10.1051/lhb/2017013
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1051/lhb/2017013.
  • About this
    data sheet
  • Reference-ID
    10655400
  • Published on:
    17/02/2022
  • Last updated on:
    17/02/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine