Critical Concerns of Production Control System on Projects with Labor Constraints: Lessons from a Residential Case Study
Author(s): |
Panagiotis Mitropoulos
Tudor Nichita |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), July 2010, n. 3, v. 26 |
Page(s): | 153-159 |
DOI: | 10.1061/(asce)me.1943-5479.0000015 |
- About this
data sheet - Reference-ID
10372147 - Published on:
29/08/2019 - Last updated on:
29/08/2019