Crane-lift path planning for high-rise modular integrated construction through metaheuristic optimization and virtual prototyping
Author(s): |
Aimin Zhu
Zhiqian Zhang Wei Pan |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, September 2022, v. 141 |
Page(s): | 104434 |
DOI: | 10.1016/j.autcon.2022.104434 |
- About this
data sheet - Reference-ID
10687080 - Published on:
13/08/2022 - Last updated on:
13/08/2022