Cracking of Upper Pipe of Hydraulic Prop Made of 32HA Steel: Case Study
Author(s): |
Krzysztof Krasnowski
Mirosław Łomozik |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Performance of Constructed Facilities (ASCE), April 2016, n. 2, v. 30 |
Page(s): | 04015013 |
DOI: | 10.1061/(asce)cf.1943-5509.0000744 |
- About this
data sheet - Reference-ID
10192539 - Published on:
02/12/2018 - Last updated on:
02/12/2018