新名神高速道路 朝明川橋,小牧高架橋の下部工施工におけるひび割れ防止対策 (Crack Control Measures for Substructure Construction in the New Meishin Expressway)
Author(s): |
S. Nojima
M. Katayama T. Hosono K. Hirano |
---|---|
Medium: | journal article |
Language(s): | Japanese |
Published in: | Concrete Journal (JCI), 2014, n. 6, v. 52 |
Page(s): | 534-539 |
DOI: | 10.3151/coj.52.534 |
- About this
data sheet - Reference-ID
10438146 - Published on:
08/10/2020 - Last updated on:
08/10/2020