0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The coupling of project delivery methods and contract strategies for public building projects in Ethiopia

Author(s):


Medium: journal article
Language(s): English
Published in: Construction Innovation
DOI: 10.1108/ci-02-2022-0043

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ci-02-2022-0043.
  • About this
    data sheet
  • Reference-ID
    10728647
  • Published on:
    30/05/2023
  • Last updated on:
    30/05/2023
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine