0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects

Author(s):
Medium: journal article
Language(s): English
Published in: Journal of Construction Engineering and Management, , n. 3, v. 139
Page(s): 267-279
DOI: 10.1061/(asce)co.1943-7862.0000621
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0000621.
  • About this
    data sheet
  • Reference-ID
    10169593
  • Published on:
    01/12/2018
  • Last updated on:
    01/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine