0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Cost overrun factor analysis for hospital projects in Vietnam

Author(s):




Medium: journal article
Language(s): English
Published in: KSCE Journal of Civil Engineering, , n. 1, v. 22
Page(s): 1-11
DOI: 10.1007/s12205-017-0947-5

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s12205-017-0947-5.
  • About this
    data sheet
  • Reference-ID
    10172859
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine