0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports

This publication has been cited in the following 24 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10586985
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine