0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Cost Impacts of Change Orders due to Unforeseen Existing Conditions in Building Renovation Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)co.1943-7862.0001888.
  • About this
    data sheet
  • Reference-ID
    10425791
  • Published on:
    22/06/2020
  • Last updated on:
    22/06/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine