Cost Estimation Model Using Modified Parameters for Construction Projects
Author(s): |
Sae-Hyun Ji
Joseph Ahn Hyun-Soo Lee Kyeongjin Han |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Advances in Civil Engineering, 2019, v. 2019 |
Page(s): | 1-10 |
DOI: | 10.1155/2019/8290935 |
Abstract: |
Construction projects require huge amounts of capital and have many risk factors due to the unique industry characteristics. For a project to be successful, accurate cost estimation during the design phase is very important. Thus, this research aims to develop a cost estimation model where a modification method integrates influential factors with significant parameters. This study identified a modified parameter-making process, which integrates many influential factors into a small number of significant parameters. The proposed model estimates the cost using quantity-based modified parameters multiplied by their price. A case study was conducted with 24-residence building project, and the estimation accuracy of the suggested method and a CBR model were compared. The proposed model achieved higher overall cost-estimation accuracy and stability. A large number of influence factors can be modified as simple representatives and overcome the limitations of a conventional cost estimation model. The paper originality relates to providing a modified parameter-making process to enhance reliability of a cost estimation. In addition, the suggested cost model can actively respond to the iterative requirements of recalculation of the cost. |
Copyright: | © Sae-Hyun Ji et al. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
1.42 MB
- About this
data sheet - Reference-ID
10334669 - Published on:
01/08/2019 - Last updated on:
02/06/2021