Cost Control: Integrated Cost/Schedule Performance
Author(s): |
Wayne M. Stevens
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), July 1986, n. 3, v. 2 |
Page(s): | 157-164 |
DOI: | 10.1061/(asce)9742-597x(1986)2:3(157) |
- About this
data sheet - Reference-ID
10374368 - Published on:
29/08/2019 - Last updated on:
29/08/2019