0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines

This publication lists 28 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10170335
  • Published on:
    02/12/2018
  • Last updated on:
    02/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine