0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Conversion of historical stone bridge to lifting bridge in the Hořín lock chamber

Author(s):

Medium: journal article
Language(s): English
Published in: ce/papers, , n. 3-4, v. 7
Page(s): 121-124
DOI: 10.1002/cepa.3075
Abstract:

The paper describes design and construction process of the unique reconstruction of the historical stone bridge at the lower head of the listed Hořín lock chamber at the confluence of the Vltava and Elbe rivers near Mělník. The original stone arch bridge from 1905 at the outlet of the lock had to be carefully dismantled and rebuilt into a lifting bridge with a vertical lift of 5 m. The goal was to preserve bridges original listed and preserved appearance and enable larger ships to pass under it. The design of reconstruction consisted of proposal of new substructure, new hidden steel superstructure, new hydraulic and mechanical parts and electronical controling system. The original appearence of the stone cladding had to be preserved, so new hidden truss steel kernel was inserted to form the support for the original stone cladding and concrete coupling shell. The stroke of the bridge is controlled electronically by hydraulic cylinders and a system of guides and restraints. The reconstruction of this unique bridge had been carrefully performed under surveilance of National Heritage Office. The project recieved the Czech Construction of the Year 2022 award.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/cepa.3075.
  • About this
    data sheet
  • Reference-ID
    10799221
  • Published on:
    23/09/2024
  • Last updated on:
    23/09/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine