Conventional tunnel drives at Sedrun / Konventionelle Vortriebe Sedrun
Author(s): |
Luzi R. Gruber
Uwe Holstein |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2016, n. 2, v. 9 |
Page(s): | 111-128 |
DOI: | 10.1002/geot.201600010 |
Abstract: |
The Sedrun section in the middle of the Gotthard Base Tunnel was critical in terms of scheduling and without doubt the section with the most complicated logistics. The article gives an overview of the complex overall construction measures and describes in detail the geotechnical and logistical challenges that had to be overcome. |
Keywords: |
fault zone Gotthard Base Tunnel geological explorations fault zone multi-function station tunnel crossover enlargement probing tunnel support machine Tavetscher Streckenausbaumaschine
|
Available from: | Refer to publisher |