Control Risk for Multimode Resource-Constrained Project Scheduling Problems under Hybrid Uncertainty
Author(s): |
Lu Gan
Jiuping Xu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), May 2015, n. 3, v. 31 |
Page(s): | 04014044 |
DOI: | 10.1061/(asce)me.1943-5479.0000243 |
- About this
data sheet - Reference-ID
10371876 - Published on:
29/08/2019 - Last updated on:
29/08/2019